Key takeaways
- A final post-construction clean goes top to bottom in every room: ceilings and fans first, floors last.
- Drywall dust hides inside cabinets, drawers, vents, returns and window tracks, so those get cleaned on every job.
- Every sticker, label, film and paint speck on glass, fixtures and appliances comes off before the walkthrough.
- Have the debris hauled, the trades finished and the water and power on before the cleaner arrives.
This is the checklist I work from on a final post-construction clean, the big clean after every trade has finished and before the owner or buyer walkthrough. It works for new builds and remodels alike. If you want to know where the final clean fits next to the rough clean and the touch-up clean, start with my guide to the three phases of post-construction cleaning.
Before the final clean: what builders and homeowners should do
A final clean goes faster, and stays clean, when the job site is ready for it.
- All trades are finished, including flooring, paint touch-ups and fixture installs
- Construction debris, scraps and dumpsters are hauled off (I don't haul construction debris)
- Water and power are on, and the lights work
- You've told me whether floor protection paper should stay down or come up
- You've pointed out any special finishes, like natural stone or specialty glass
- I have a key, lockbox or door code if no one will be on site
Every room
I work top to bottom so falling dust never lands on a surface that's already done.
- Ceiling corners and cobwebs
- Ceiling fans and light fixtures dusted; stickers and films removed
- AC vents and air returns cleaned (I do these on every job)
- Walls dusted top to bottom
- Trim, baseboards, door frames, tops of door frames and doors wiped
- Outlet covers, switch plates and door hardware wiped
- Window sills and ledges
- Closets, shelves and built-ins vacuumed and wiped
- Floors vacuumed and mopped; carpets vacuumed
- Cleaning waste bagged and removed from living areas
Kitchen
- Cabinets inside and out; shelves and drawers vacuumed, then wiped
- Counters and backsplash; grout haze and adhesive removed
- Sink and faucet cleaned and shined
- New appliances: stickers and films removed, and construction dust wiped out inside and out
- Range hood and cabinet tops dusted
- Pantry shelves
- Floor, including under the toe kicks
On new appliances this is a light wipe-out of construction dust, not degreasing. It gets them ready for first use.
Bathrooms
- Tubs and showers scrubbed; tile and grout haze wiped down
- Shower glass and doors; labels and specks removed
- Toilets inside, outside, base and behind
- Vanities inside and out, sinks and faucets
- Mirrors and medicine cabinets
- Exhaust fan cover dusted
- Towel bars and toilet paper holders
- Floor, including behind the toilet
Bedrooms and closets
- Closet shelves, rods and floors
- Closet door tracks vacuumed
- Window sills and tracks
- Ceiling fans, vents and returns
- Baseboards and door frames
- Floors and carpet edges
Living areas, stairs and laundry
- Mantels, built-ins and shelving
- Stair treads, risers, rails and balusters
- Laundry room cabinets, shelves and the outside of new machines
- Utility sinks
- Entry and hallway floors
Windows and doors
Windows and doors collect the most stickers, specks and grit on a new build.
- Interior glass cleaned
- Manufacturer labels, stickers and tape residue removed
- Paint specks removed from glass where it's safe to do so
- Window and sliding door tracks vacuumed and wiped
- Frames and sills wiped
What I find on these jobs
These are "before" photos from new builds and remodels on Boca Grande Island, Florida, where I did post-construction cleaning before starting Curries Cleaning Services.



What's not included
- Hauling construction debris, dumpsters or heavy materials
- Hazardous materials of any kind
- Exterior pressure washing
- Repairs or paint touch-ups
How to check the work before the walkthrough
- Run a finger along the top of a door frame and a baseboard. There should be no dust.
- Open a few cabinets and drawers and look in the corners.
- Look at the windows with the sun on them. That's when specks and residue show.
- Check the window and sliding door tracks.
- Look up at the vents, returns and fan blades.
- Make a list of anything missed. If I missed something, tell me and I'll come back to fix it as soon as possible.
How long a final clean takes
It depends on the size of the build and how much dust and residue is left. I work alone, so a large build takes at least one full day, sometimes more. When you ask for a quote, tell me the square footage and your walkthrough date, and I'll fit the clean around your schedule.
I specialize in post-construction cleaning for builders, remodelers and homeowners within about 45 road miles of Owenton, plus Lexington and Fayette County. Builders can also see how I work with builders and remodelers. Call or text (859) 428-7957 for a free quote.
Post-construction cleaning checklist FAQ
What should be done before a post-construction clean?
All trades should be finished, construction debris and dumpsters hauled off, and the water and power on. Let your cleaner know whether floor protection should stay down and point out any special finishes.
Do you clean inside new appliances?
Yes. On a post-construction clean I remove the stickers and films from new appliances and wipe the construction dust out inside and out. It's a light wipe-out to get them ready for first use, not degreasing.
How long does a post-construction clean take?
It depends on the size of the build and how much dust is left. I work alone, so a large build takes at least one full day, sometimes more.